1. PT.GRAHA MEGARIA SURABAYA SURABAYA TOWN SQUERE
  • Pekerjaansipil di area STP
  • Supplier dran sludge rellesersecarakontinu
  • Pekerjaan mechanical
  1. PT.HARDAYA WIDYAGRAHA GRAND CITY MALL
  • Supplier material untukperawatan STP ( serwage treatment plan) meliputiBakterikulturisdan PAC
  1. PT.GALAXY MALL
  • KontrakkerjaPerawatan STP
  1. PT.PAKUWON JATI GRUP
  • Pekerjaansipil
  • Pekerjaan electrical
  • Pekerjaan mechanical
  • Kontrakkerjaperawatan AC di ECC laguna
  • Kontrakkerjaperawatan AC di Tunjungan Plaza Surabaya
  1. PT. BUKOPIN
  • Supplier baktericulturis
  1. CV.SINAR BOX
  • Supplier perawatanlimbah
  1. PT. CATUR MITRA SEJATI SENTOSO
  • Maintenance AC
  • Kontrakkerjaperawatan AC
  1. PERHIMPUNAN PENGHUNI MALL MATOS
  • Suppliyer solar
  • Suppliyertransvelator
  • Fill rate solar tokicho
  • Pengadaandanpemasangan AHU
  • Pengadaandanpemasangan ducting PU
  1. PG. Gorontalo. Toelang Hula, Gorontalo-Sulawesi Utara ( Complated)
  • WTP Project with JWTW (Supervision) – 2 x 30 M3/H
  • Carbon Filter Unit 2. 2 x 30 BW
  • Reverse Osmosis Unit
  1. PT. KertasLeces( Persero ) . Probolinggo- JawaTimur (Complated ) Sub. From

WaskitaKarya( Persero ) No. SPK 142/ SPK/WK/D.EPC/KL/2012

  • Commisioning : Firing, Soda Boiling, Steam Flushing, Performent Test,
  • Operasional& Maintenance of 2x 120 T CFB Boiler
  1. PT. MJIS (Krakatau Steel &Antam). WHR POWER PLANT 2x15MW BatuLicinKal-Sel

Sub. From PT.Weltest Energy Nusantara /JWTW Tgl SPK 03/1/2012

  • Chemical Cleaning ( Acid & Alkali Cleaning )
  1. PT. Jatim Taman Steel Tbk . Taman, Sidoarjo- Jatim( Complate) WTP Project 2 x 15 M3/

H (Procurement & Installation): No. PO/1210/000229 –

  • Sand Filter> Carbon Filter> Softener Exchanger Tgl 19/10/2012 – Sand Filter>

Carbon Filter> Softener Exchanger>Ultra Filtration Unit>BWRO Unit

  1. PLTU 2×25 MW AMORANG ( PLN ) . Menado – Sulawesi Utara

Sub. PT. WIKA (Persero) Tgl SPK 31/12/2012

  • KontrakSupervisi di PLTU Amorang
  1. PLTU 2×100 MW TARAHAN ( PLN ) . Tarahan ,Lampung-Sumatra Selatan Sub. From PT.

AdhiKarya (Persero) Tgl SPK 03/2/2013 Kontrak

  • Commisioning Power Plant
  1. PLTU 2×50 MW TANJUNG AWAR-AWAR, Wadung, Jenu, Tuban-Jawa Timur Sub. From
  2. China CMIIC
  • Engineering & Construction Job Insullation and Cladding
  1. CV. TRIMITRA SEJAHTERA, PondokJati ,Sidoarjo- JawaTimur Supply to

BarataIndonesia ,untuk PLTU NTB

  • Chemical Traetment : Flocculant, Anti Scalant RO, Chlorine Scavenger, Chlorine
  1. CV. KALAM BEVERAGE, Sidoarjo, JawaTimur Job From

Martha Electronic ,Osowilamgun-Sby

  • WWTP/ Limbah Cat : 1. Sendimentation Tank 2. Sand Filter 3. Carbon Filter
  1. PT. SIERAD PRODUC Tbk, Wonoayu, Sidoarjo-JawaTimur
  • Repair Screw Compressor Atlas Copco GA 15
  1. PT. HOPAX INDONESIA Tbk, Ngoro, Mojokerto-JawaTimur
  • Gas Boiler Modification with Economizer Boiler 3 Ton , Spare part and Tools for Effisiency target, SPK No. 205/HI-MEI/XI/13
  1. CV . KARYA SUKSES SEJATI Menganti, Gresik-JawaTimur
  • Beton Press Machine Type T-15, for Waste solid and fly ash solution
  • Pengolahanlimbahbatubara PO No. 305/KSS-WWT/25-12-2013
  1. PT. TimurMegah Steel Tbk, Gresik-JawaTimur
  • Repair Screw Compressor Atlas Copco GA 15 and Spare Part Compressor SPK No. 1105/TMS-MEI/2-2014
  1. PLTU 2x 8 MW TARAHAN PT. Bukit AsamTarahan , Lampung Selatan Sub. Pusaka Jaya Int’l
  • Operation & Maintenance ( Kontinyu ) addendum sampaisekarang 2015
  1. RSUD Gambiran Kediri-JawaTimur
  • IPAL Anaerob RSUD Gambiran Kediri
  1. PT. NATURA PLASTINDO
  • Pre-Filter – BWRO 1.5 Tph for Make-up Boiler dan chemical treatment
  1. PT. LOHJINAWI,
  • Softener Cap. 20 TPH + Gravity Sand Filter 100m3/h
  1. PT. SORINI AGRO ASIA CORP Tbk.
  • Paving Press Machine Type MT-15: for Waste solid fly ash Bottom ash Solution
  1. SUMBER ASIA
  • WTP, WWTP An-aerob dan Pengendali Udara (Wet Scrubber) Sebagai Konsultan dan

Pengadaan unit System.

  1. PT. HARMONY ENERGI INDONESIA
  • Lime Stone Silo untuk PLTU BarutaBau-bauSultara
  1. PT. KARYA INTI MANDIRI
  • Dust Collector untuk Boiler Unit
  1. PT. KARYA KHARINDO PAPUA UTAMA
  • Tangki Solar Cap 50,000 KL PLTD Papua, Irian Jaya
  1. PLTU 2×7 MW BARUTA (PT.Harmoni Energy Indonesia+PT.MUDA JAYA, Malaysia)
  • Sebagai Percepatan Proyek Pembangkit Listrik.
  • Kontrak Operation & Maintenance Power Plant Unit ( Kontinyu)
  1. PT. MITRA ADYANIAGA
  • Installation &Commisioning Belt Press di PT.ANJSorong, Papua-Irian Jaya
  1. PT. PENAMAS NUSAPRIMA
  • Pengadaan Demin Plant Unit 10m3/h ( Cation-Degass-Anion)
  1. PLTU 2x7MW BARUTA , PT. Harmony Energy Indonesia
  • Improvement WTP-SWRO 10m3/jam
  1. PT. ALUVINDO EXTRUSION
  • Improvement Demineralizer Plant 5m3/jam
  1. PT. WilmarNabati Indonesia Gresik
  2. PT. WilmarNabati Indonesia Bitung Sulawesi
  3. PT. Miwon Indonesia Dryorejo Gresik
  4. PT. Indonesia Smelting Teckhnologi, PIER Pasuruan
  5. PT. CheilJedang Indonesia, RejosoPasuruan
  6. PT. CamcoOmya Indonesia
  7. PT. PJB MuaraKarang, Jakarta
  8. PT. Sadhana, Pandaan Pauruan
  9. PT. Indonesia Tri Sembilan